APM Terminal Cores Interface at LAX

Recommend
  • Facebook
  • Twitter
  • LinkedIN
  • Pinterest
Share
Tagged in
Leave a reply

Description
In support of the Landside Access Modernization Program (LAMP), this project will provide new Terminal Improvements at Los Angeles International Airport (LAX) to integrate the new Automated People Mover (APM) system with the existing Terminals.

Tom Bradley International Terminal (TBIT) Core: This will be a new 3+ level facility on the east side of the Tom Bradley International Terminal (TBIT) with elevators, escalators and stairs. The TBIT Core will also include minor modifications, enhancements and additions to the existing interior spaces (restrooms, concessions, office space, etc.).  A future pedestrian walkway will connect TBIT Core to the future APM Station between Parking Structures 3 and 4, and structural provisions will be included in the TBIT Core to support and interface with this future pedestrian walkway.

 
Clients
  • Austin Commercial LP
  • AC Martin
  • Los Angeles World Airports
Consulting Services Provided
  • BIM Execution Planning
  • BIM Coordination for the design & construction teams using Autodesk Navisworks
  • Implementation Autodesk Revit with Autodesk BIM 360
  • Implementation of Autodesk BIM 360 Field
  • Implementation of BIM Track
  • Data Analytics
  • 4D BIM simulation using Bentley Synchro
  • 5D BIM using Autodesk Assemble
  • Reality Capture (LiDAR) using Faro & Autodesk ReCap