East Los Angeles Community College

TITAN AEC provided Autodesk Revit training for the project team.  Images courtesy of HGA Architects & Engineers.

Share
Glendale Community College Lab Services Building

The Lab Services Building is an integral part of the Glendale Community College.  Lundgren Management was the Construction Manager for this community college project.   TITAN AEC was brought in by

Share
USC Village

USC Village combines student housing with a dining hall and ground-floor retail, including a Trader Joe’s and Target open to the public.   This project is 1.25-million-square-foot residential and retail center

Share
Midfield Satellite Concourse at LAX

Design/build project creating a new remote satellite concourse for the international terminal at Los Angeles International Airport (LAX).  The satellite concourse, estimated at $1.3B, will be a remote facility initially

Share

Great Wolf Lodge is a family entertainment water park resort with a hotel and conference center that sits on 12 acres.  In addition to 603 guest rooms, a three-acre indoor

Share
USC Jill & Frank Fertitta Hall

As an extension of the USC Marshall School of Business, Jill and Frank Fertitta Hall transforms the educational environment at the University of Southern California.  TITAN AEC provided BIM execution

Share
Barlow Respiratory Hospital

Barlow Respiratory Hospital is an acute care medical center near downtown Los Angeles.  TITAN AEC provided training in Autodesk Revit using Revit Server and Autodesk Navisworks for design BIM coordination

Share
Westfield Century City

Westfield Century City is a two-level, 1.3 million-square-foot outdoor shopping mall in the Century City commercial district in Los Angeles, California. A property of the Unibail-Rodamco-Westfield (URW), the mall is

Share
Terminal 1 – Los Angeles International Airport

TITAN AEC provided consulting services for building information modeling (BIM) to support the contractual owner mandates required by Los Angeles World Airports.  TITAN AEC also provided virtual design & construction

Share
Sutter Santa Rosa Regional Hospital

TITAN AEC provided project based training, BIM consulting, and project support for Autodesk Revit and Autodesk Navisworks for the architectural and structural design teams in Sacramento.  The consulting team at

Share